lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue


$13.99

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue

From the model

lynxking dog lovers clublynxking dog lovers club

lynxking

A manufacturing unit model specializing in pet provides with an expert staff. We insist on utilizing the most effective supplies to make the most effective merchandise.

lynxking snap leasheslynxking snap leashes

lynxking canine leasgh sequence

canine leash and collar

slip lead & examine twine sequence

slip lead & examine twine sequence

slip lead canine leash Braided

Canine Leash Webbing Lead

Test Wire Canine Leash Lengthy

Canine Collar Gentle Padded

Snap lead canine leash

Braided Canine Coaching Leash

Double Deal with Canine Leash

dog collardog collar

dog collar for large dogsdog collar for large dogs

Bundle Dimensions ‏ : ‎ 11.69 x 6.1 x 1.93 inches; 8.47 ounces
Merchandise mannequin quantity ‏ : ‎ LL-1
Date First Obtainable ‏ : ‎ July 20, 2019
Producer ‏ : ‎ Keenleader.,ltd.
ASIN ‏ : ‎ B08HJ1RDN4
Nation of Origin ‏ : ‎ China

SUITABLE THICKNESS CHECK CORD: To discover a stability between weight and power. 3/8” is an acceptable thickness for lengthy coaching canine leash, it has each power and portability
NO TANGLE LONG ROPE LEASH: the spherical climbing rope and 360 diploma rotating clasp design lengthy coaching leash is not going to tangle whether or not it’s in use or whenever you roll it up, nice for mountain climbing, tenting, coaching, looking, yard, seaside, recall coaching, outside play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: comfortable and light-weight Non-absorbent materials will not get an increasing number of heavy within the water and received’t sink, it should float when submerged and extremely seen in opposition to any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: examine twine has a snug woven double layer deal with, the joint of the rope is sewn by the machine and may be very sturdy.
SIZE: 3/8″ (9.5 mm) in diam ,Measurement of this one is 15foot,coloration blue, by 10 foot 15 foot, 30 foot and 50 foot three size for various coaching objective

Based on 0 reviews

0.0 overall
0
0
0
0
0

Be the first to review “lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue”

There are no reviews yet.